
- 5pm – Closing of freeway off ramps
- 5:45pm – Inbound traffic roads to Las Vegas Boulevard have soft closures set in place
- 6:15pm – Vehicles removed from Las Vegas Boulevard
- 6:30pm – Inbound roads to Las Vegas Boulevard cleared
o Hard closures in place
o Strip closed to vehicle traffic
- 8:00pm – 12:00am – Main event
- 12:00am – 12:15am -Fireworks on the strip at the following locations:
- MGM Grand
- Aria
- Planet Hollywood
- Caesar’s Palace
- Treasure Island
- The Venetian
- Stratosphere
- 2:00am – Begin moving street sweepers
- 3:00am – Soft and hard closures removed, opening the streets to vehicular traffic after sweepers.
o Private drives can be opened after sweepers have passed.